7.
Refer to
1.1.5 Install AC Power Cords on 19” Chassis on page 3-15
to
continue installation of the chassis or, Chapter 6 paragraph
2.1 Installation
and Safety Precautions on page 4-3
for installation of blades.
S
ECTION
6
B
ATTERY
C
ONNECTION
Two types of battery connection provide battery life during a power failure, the internal
battery and an external battery with CHS LARGE BATT BOX.
6.1
Installing the Internal Batteries 19” (CHS2UG) Chassis
An internal battery source using two batteries can be installed using the CHS2UG
BATT MTG KIT (mounting kit) and CHS2UG BATT CABLE INT (internal cabling).
CHS2UG BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1.
Power down the CHS2UG chassis
2.
Disconnect AC power and grounding cable from rear of chassis.
3.
Remove screws from battery access panel on rear of chassis.
Ensure the CHS2UG chassis is powered OFF.
Figure 3-68 Removing Battery Access Panel
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...