![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970089.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 17
m
Stand-mounted refer to
4.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-46
.
From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.
1.2.1
Install Grounding on 9.5” Chassis
1.
Ensure the 9.5” chassis is powered off and the AC power cord is
unplugged.
2.
Ground the chassis by connecting a 14 AWG wire from the FG lug on
the back side of the chassis to an electrical service ground (such as a
cold water pipe). Refer to
Figure 3-27 9.5” Chassis (Rear View)
.
Figure 3-26 9.5” Chassis (Front View)
Figure 3-27 9.5” Chassis (Rear View)
3 Universal Slots
(Slot 1 for CPU)
Power Switch
and LED
Ground
AC Inlet
For External Battery
(12V Connection)
CHS2UG
Chassis
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...