System Hardware Manual
3 - 1
Chapter
3
Installing the SV9100 Chassis
S
ECTION
1
G
ENERAL
I
NFORMATION
This chapter contains information to help the technician install the chassis
for the SV9100 system. The technician should be familiar with this section
before
installing
any equipment.
1.1
Installing the 19” (CHS2UG) Chassis
The CHS2UG chassis has six universal blade slots for legacy line/trunk
blade (Single Line Telephone Interface, Digital multiline terminal
Interface, Central Office Trunk, ISDN PRI Interface, etc.). In-skin
Application Blades (In-skin UMS, In-Skin Router, etc.). It also houses
the BUS Interface Blade, Power Supply Unit (PSU) and Cooling Fan.
When the GCD-CP10 blade is installed in the first 19” chassis, it is
called the controlling chassis. Additional chassis, called expansion
chassis, can be installed to increase the capacity of the system to meet
the customer’s business needs. Each chassis (Expansion or
Controlling), is powered by an MPS7101 power supply.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...