Issue 1.2
UNIVERGE SV9100
3 - 58
Installing the SV9100 Chassis
12. Reinstall access panel containing the fan and secure with supplied
screw.
13. Connect grounding and AC power cable.
6.2
Installing the External Batteries 19” (CHS2UG) Chassis
An optional (locally procured), external battery source can be used to provide
power during a power failure.
CHS LARGE BATT BOX (Backup time = Three Hours for 30 Terminals)
6.2.1
Floor Mounting the CHS LARGE BATT BOX
Figure 3-77 Installing the Access Panel
Table 3-2 CHSG LARGE BATT BOX Capacity
Configuration
Battery Capacity
(Number of Batteries)
Number of
CHSG LARGE
BATT BOX
SV9100
2U x 1
21AH (=3 sets of [2x12V-7AH])
1
2U x 2
42AH (=6 sets of [2x12V-7AH])
2
2U x 3
63AH (=9 sets of [2x12V-7AH])
3
2U x 4
84AH (=12 sets of [2x12V-7AH])
4
è
One CHSG LARGE BATT BOX can be used for 4 x 2U chassis for approximately 45
minutes.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...