![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970180.webp)
Issue 1.2
UNIVERGE SV9100
4 - 26
Installing the SV9100 Blades
BAT
Lithium Battery Socket (for backup of SRAM memory
data)
Load (S5)
Load Switch
S6
SENSE Switch
Table 4-10 GCD-LTA RJ45 Cable Connector Pin-Outs
USB Cable Connector – J13 (Type A, Female)
(USB 1.1/2.0 Standard)
Pin No.
Signal
1
Vcc
2
-D
3
+D
4
GND
Ethernet Cable Connector – J4 (RJ-45)
(10Base-T/100Base-TX/1000Base-T Port)
Pin No.
Connection
1
Tx+
2
Tx-
3
Rx+
4
–
5
–
6
Rx-
7
–
8
–
Pin Jack – CJ11/J12
(Polarity)
Pin No.
Signal
1
EXT1
2
EXT2
Table 4-9 GCD-CP10 Connections (Continued)
Connector
Connector Description
1 2 3 4
1
8
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...