![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970075.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
3 - 3
Chassis.
3.
Slide the GCD-CP10 blade into the chassis until resistance (back
plane) is felt.
4.
Gently push until the blade seats. Tighten the two retaining screws on
front of the blade.
1.1.2
Installing Expansion Blades in the 19” Chassis (Optional)
When adding additional chassis to the system to expand the capacity, a
GPZ-BS10 must be installed in the Controlling Chassis and a GPZ-BS11
must be installed in all Expansion Chassis. This connection is required with
any multiple-chassis setup.
Figure 3-3 19” Controlling Chassis – Guides Slot 1
Figure 3-4 Installing the GCD-CP10 Blade
Figure 3-5 GCD-CP10 Blade Installed
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...