![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970206.webp)
Issue 1.2
UNIVERGE SV9100
4 - 52
Installing the SV9100 Blades
4.5.4
Connectors
Table 4-25 GCD-LTA RJ61 Cable Connector Pin-Outs on page 4-52
shows the pin-outs for the RJ-61 connector. Refer to
Figure 4-13
GCD-LTA Blade on page 4-49
for an illustration showing the location
of the connectors on the GCD-LTA blade.
Table 4-25 GCD-LTA RJ61 Cable Connector Pin-Outs
RJ61 Cable Connector
Digital: CN101 (ports 1~4)
Digital: CN102 (ports 5~8)
Pin No.
Connection
1
T4/T8 (Tip for port 4 or 8)
2
T3/T7 (Tip for port 3 or 7)
3
T2/T6 (Tip for port 2 or 6)
4
R1/R5 (Ring for port 1 or 5)
5
T1/T5 (Tip for port 1 or 5)
6
R2/R6 (Ring for port 2 or 6)
7
R3/R7 (Ring for port 3 or 7)
8
R4/R8 (Ring for port 4 or 8)
RJ61 Cable Connector
Analog: CN201 (ports 1~2)
Pin No.
Connection
1
–
2
–
3
T2 (Tip for port 2)
4
R1 (Ring for port 1)
5
T1 (Tip for port 1)
6
R2 (Ring for port 2)
7
–
8
–
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual Issue 1 2 January 2015...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Page 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Page 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Page 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Page 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Page 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Page 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Page 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...