GBC StreamWire
07/23/2020
RTPS
2-42
RTP 4.19 J368- PUSHOVER FWD ENCODER TIMEOUT
J368 is triggered if it takes longer than specified time to count the encoder
steps needed for the Pushover to go in the forward direction.
1. Do GP 6.4 to check S31 Pushover encoder sensor
This clears the fault
Yes
- Return to normal operation;
No
- Go to Step 2
2. Do GP 6.5 to check M12 Element pushover motor
This clears the fault
Yes
- Return to normal operation;
No
- Go to Step 3
3. Replace the Pushover Motor Assembly (PL 5.13)
This clears the fault
Yes
- Return to normal operation;
No
- Go to Step 4
4. Do 6.3.5 FIRMWARE UPGRADE Procedure to Re-flash the firmware
for eWire.
This clears the fault
Yes
- Return to normal operation;
No
- Go to Step 5
5. Do REP 11.2 “B” Main Control Board Replacement
.
This clears the fault
Yes
- Return to normal operation;
No
- Escalate to second level
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...