Repairs/Adjustments
07/23/2020
GBC StreamWire
4-124
REP 6.2 Closer Encoder Sensor Replacement S48
PARTS LIST ON PL 5.19
Use this procedure to remove and install the S48 Closer Encoder sensor.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 6.4
Module and Closer Motor.
4. Do GP 6.4 to locate the S48 Closer Encoder sensor.
5. Remove the cable from the header on the sensor and remove the
Sensor Bracket by removing the M3 Screw.
6. Remove the M3 Screw to remove the sensor from the Sensor
Bracket.
Installation Procedure
1. Attach the new sensor to the Sensor Bracket using the M3 Screw.
Use the cutout in the bracket to align the sensor. Take care that the
underside of the sensor is sitting flush against the bracket.
2. Secure the Sensor Bracket into place by tightening the M4 Screw.
Ensure that the Encoder is centered with the Sensor.
3. Connect the Sensor cable.
4. Do Rep 6.4
Motor and Closer Module.
5. Connect the Power Cord.
6. Power ON the eWire.
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...