Repairs/Adjustments
07/23/2020
GBC StreamWire
4-190
ADJ 1.9 Holder Rotate Adjustment
The Holder rotation linkage can be adjusted to ensure the Holder is
properly vertical when in the vertical position or horizontal when in the
horizontal position. Follow the steps in this section to verify that the
Holder Rotate linkage is operating as expected.
Inspection Procedure
1) Do GP 6.3. to access the Functional Tests menu. Select the Holder
Rotate functional test, which will allow you to move the Holder into a
vertical or horizontal position.
Service Settings Menu
Function Tests
Holder Rotate
2) Cycle the Holder from vertical to horizontal several times. Ensure that
the linkage moves smoothly. Check the bars in the linkage to see if
any of them are bent or loose.
3) With the linkage in the Horizontal position, ensure that the Holder
face is flat. A small level can be used for this purpose. The Element
Height Setup Tool lever can be used for this.
Adjustment Procedure
1) Fine adjustment to the Holder Vertical or Horizontal position can be
made by adjusting the setscrew(s) on the Holder yoke. Note that
there is a setscrew for both vertical and horizontal adjustment.
2) In some cases, the Holder may need to be adjusted slightly past
horizontal to achieve better closing roundness.
3) Repeat this process until the proper positions are reached for both
vertical and horizontal Holder positions.
4) Return to the RTP that brought you here.
Horizontal
adjustment setscrew
Vertical adjustment
setscrew
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...