Repairs/Adjustments
07/23/2020
GBC StreamWire
4-158
9. Frame
REP 9.1 Interlock Switch Replacement, Top Cover
PARTS LIST ON PL 5.25
Use this procedure to remove and install the Interlock Switch for the Top
Cover.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Raise the Top Cover.
4. Remove the M4 Screws (2) to remove the Interlock Bracket.
5. Disconnect the Cables to the Interlock Switch. Note the orientation
of the Cables as they need to be re-installed in the same
configuration.
6. Remove the old interlock by depressing the tabs on the interlock
and removing it from the cutout in the bracket.
Installation Procedure
1. Install the new Interlock by pressing it into the Interlock Bracket until
the tabs snap into place.
2. Reattach the wires, being careful to maintain the correct wire
orientation.
3. Position the interlock switch on the Frame and secure it using the
M4 Screws and Washers (2).
4. If necessary, adjust the Interlock Switch position so that the
Interlock Flag is centered in the Interlock Switch.
5. Connect the Power Cord
6. Turn power ON to eWire.
Tabs
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...