GBC StreamWire
7/23/2020
Repairs/Adjustments
4-41
REP 2.28 M4 Motor Replacement
PARTS LIST ON PL 5.4
Use this procedure to remove and install the M4 Motor on the Upper
Paper Transport Assembly Baffle.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Raise the Upper Bypass and Lower Bypass.
4. Remove the Upper Baffle by removing the M4 Screws (4) and
Locating Pin, which is attached with an M3 Screw. Slide the Upper
Baffle off of the remaining Locating Pins to remove.
5. Remove bracket by removing the M4 Screws (2)
6. Remove M4 Motor from bracket by removing the M4 Screws (3)
Installation Procedure
1. Attach new motor to bracket with M4 Screws (3).
2. Attach bracket to Upper Paper Transport with M4 Screws (2).
3. Slide Upper Baffle onto Locating Pins and attach the Locating Pin
that was removed in Step 4 with an M3 Screw.
4. Secure Upper Baffle with M4 Screws (4) removed in Step 4.
5. Connect the Power Cord.
6. Power ON the eWire.
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...