Repairs/Adjustments
07/23/2020
GBC StreamWire
4-102
5. Lift the Idler Pulley Assembly up and off the tension adjustment
screws. If removing the Pulley Assembly is too difficult, tighten the
tension screws further by repeating the procedure in Step 4.
6. Carefully slide the Idler Pulley Sub-Assembly away from the belt
and free of the machine. Take care to avoid damaging the Belt.
7. Repeat the procedure for the other side.
Installation Procedure
1. Slide the new Idler Pulley Assembly between the machine frame
and the Vacuum Stacker belt.
2. Carefully lift the Idler Pulley, applying light tension to the belt.
Place the counter-bored holes on each end of the Idler Pulley
shaft onto the heads of the tensioning screws. If it is too difficult to
lift the Idler Pulley shaft onto the tensioning screws, reduce the
screw height by tightening the tensioning screws.
3. With the Idler Pulley Assembly in place, loosen the tensioning
screws until proper tension is achieved on the Vacuum Stacker
Vacuum Stacker Belt Replacement
additional detail on belt replacement.
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...