Repairs/Adjustments
4-207
ADJ 1.23 Holder to Closer F Adjustment
An F size spool must be installed in the eWire to perform this adjustment.
This adjustment changes the height the holder holds the element at when
the closer comes to receive it. This only effects behavior with an F size
element. The ideal position for this adjustment is when the bottom of the
element rests lightly on the bottom closer jaw. The holder should not
visibly lift when it meets the closer and you should not be able to slide a
piece of paper between the bottom closer jaw and the element when the
holder and closer are mated.
1) Remove the deflector from the eWire to better view the holder
and closer. Ensure that the removed cable pins are not touching
each other or the frame. Perform REP 5.1 to remove the
deflector. Leave this out of the machine until you complete the F
Size Partial Close Adjustment
2) Open the top cover and place an interlock cheater in the top
cover interlock.
3) Perform the Feed element function test with the top cover open
a. Service Menu
→
FUNCTION TESTS
→ ELEMENT
CYCLE → FEED ELEMENT → LTR or A4
4) After the element feed completes select PARTIAL CLOSE. When
the closer begins to move remove the interlock cheater.
b. Service Menu
→
FUNCTION TESTS
→ ELEMENT
CYCLE → PARTIAL CLOSE
5) Push the closer toward the holder by hand slowly until the
element is about to enter the closer
c. Place your left hand on the holder and advance the
closer towards the holder until the element enters the
closer.
d. If you felt the holder being lifted by the closer when they
met, HOLDER TO CLOSER F must be reduced.
e. If the element entered the closer and did not lift at all,
reduce the HOLDER TO CLOSER F value until you feel
the closer lightly rub the bottom of the element when
performing step 5.
6) Repeat steps 3-5 until the element is resting on the lower closer
jaw properly.
Below is an example where the element is hitting the closer jaw.
When pushing the closer towards the holder, the element hit the
lower jaw and the closer could not advance without lifting the
holder.
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...