GBC StreamWire
07/23/2020
General Procedures and Information
6-53
GP 6.5.10
Check M19
WARNING
Moving Parts, keep hands clear of the eWire when
performing motor checks. Make sure that power is
disconnected from the machine before touching any
moving parts.
Locate motor M19:
•
Motor M19 is located on the Book Drawer.
•
Open the book drawer door all the way
•
Insert a cheater into the Book Tray Interlock
“Tray Home” to check the function of the
Book Drawer Motor. The book drawer should rise all the way to its up
position. If it is already up, it will move down slightly and return home.
Motor operates as expected
Yes
- Return to the RTP that directed you here
No
- Go to Step 2.
2. Make sure the motor wire is connected securely at the header and at
the Main Control Board (PL 5.27). Do REP 1.5 to remove the Rear
Cover to gain access to the connector at the Control Board. Refer to
to identify termination location.
All the connectors are securely connected.
Yes
- Go to Step 3
No
- Make the connection and resume operation
3. Do GP 6.3.5
to Re-flash the firmware for the
eWire
This clears the fault
Yes
- Resume normal operation;
No
- Go to Step 4
4. Check the tightness of the set screws on the Pulley attached to the
motor shaft and the pulley attached to the Book Drawer shaft.
This clears the fault
Yes
- Resume normal operation
No
- Go to Step 5
5. Inspect the Timing Belt for damage. Make sure that the belt is not
frayed or damaged.
Belt Looks OK
Yes
- Go to Step 6
No
- Replace the Timing Belt.
6. Inspect the Book Drawer for damage or obstructions. Replace any
parts that look damaged or worn.
Book Drawer Mechanism looks OK
Yes
- Go to Step 7
No
- Replace the damaged components.
7. Replace the cables from the motor to the Main Control Board. Refer
This clears the fault
Yes
- Resume normal operation
No
- Go to Step 8
8. Replace Main Control Board B (REP 11.2)
This clears the fault
Yes
- Resume normal operation
No
- Escalate to second level
Summary of Contents for StreamWire
Page 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Page 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Page 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Page 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Page 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Page 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Page 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Page 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Page 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Page 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Page 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Page 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Page 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Page 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Page 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Page 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Page 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...