![EXFO FTB-1 User Manual Download Page 433](http://html1.mh-extra.com/html/exfo/ftb-1/ftb-1_user-manual_2450042433.webp)
Test Results
NetBlazer
421
Summary (Link OAM)
Summary (Link OAM)
From the
Test
menu, tap
Results
, and the
Summary
tab.
Test Status
displays the current status of the Link OAM test. The global
test pass/fail verdict is displayed next to the
Test Status
when enabled
(see
Pass/Fail Verdict
Start Time
Indicates the date and time the test has been started. The
date and time is reset every time the test is restarted or reset.
Power Recovery
when displayed, indicates that the test has
automatically recovered from a power failure. The number of
occurrences is also displayed next to the
Power Recovery
field. Refer
to
Logger Full
, when displayed, indicates that the logger is full. Refer to
Logger and Alarms/Errors Logger
Alarms
Link OAM
indicates that no OAM Information PDUs were received for 5
seconds.
Critical Event
: Indicates that the OAM link partner has sent a critical
event notification (bit 2 of the Flags field is set to 1).
Test Status
Description
--
The test is not running or results are not available.
In Progress
The test is running.
Completed
The test is completed, stopped at the planned time, or manually stopped when there is no
set timer.
Aborted
The test is interrupted; stopped before the set timer.
Summary of Contents for FTB-1
Page 1: ...User Guide FTB 700G 800 Series NetBlazer for FTB 1 ETHERNET AND MULTISERVICE TESTER...
Page 12: ......
Page 20: ......
Page 22: ......
Page 52: ......
Page 59: ...Test Setup Test Applications NetBlazer 47 SONET SDH BERT For SDH BERT...
Page 64: ...Test Setup Test Applications 52 FTB 700G 800 Series SONET SDH DSn PDH BERT For SDH...
Page 84: ......
Page 98: ......
Page 298: ......
Page 574: ......
Page 652: ......
Page 674: ...0 5 1 5 48 5 0 176 W d y K y K D...