A
B
C
D
E
F
G
H
L
M
N
P
Motore
Engine
sezione / section
N 4.1
26
Monster S2R 1000
- M.Y. 2006 - edizione/edition 00
Rotate in the same direction until you
obtain a
1 mm
lift on the intake end.
Check the angular value on the
degree wheel.
Continue turning the shaft until
reaching the point of total closure of
the valve on the expansion stroke.
Now rotate the degree wheel (G) in
the opposite direction (i.e. clockwise)
until gauge (F) shows a
1 mm
lift of
the intake valve. Check that the
angular value is as specified.
Continue turning the degree wheel
clockwise until the gauge shows a
lift of the exhaust valve of
1 mm
.
Check the angular value against the
specified value.
Repeat the procedure for the vertical
cylinder.
Permissible tolerance for measured
values is
±3°
with respect to
specified values.
Remove the tools used to check
engine timing.
Operation
See Sect.
Refit the valve covers
N 4.3
Refit the lateral timing
covers
N 4.2
Continuare la rotazione nello stesso
senso fino a leggere un’alzata di
1 mm
sull’aspirazione. Verificare sul
goniometro il valore angolare.
Continuare la rotazione fino a
raggiungere il punto di chiusura
totale della valvola corrispondente
alla fase di scoppio.
A questo punto invertire il senso di
rotazione (diventa orario) del
goniometro (G) fino a leggere sul
calibro (F) un’alzata della valvola
aspirazione di
1 mm
. Verificare il
valore angolare con quello prescritto.
Proseguire nella rotazione oraria del
goniometro fino a leggere un’alzata
della valvola di scarico di
1 mm
.
Verificare nuovamente il valore
angolare con quello prescritto.
Eseguire le stesse operazioni per il
cilindro verticale.
E’ consentita una tolleranza di
±3°
nei valori riscontrati con la procedura
descritta rispetto a quelli prescritti.
Rimuovere gli attrezzi installati per la
verifica fasatura.
Operazioni
Rif. Sez.
Rimontare i coperchi
valvole
N 4.3
Rimontare i coperchi
laterali distribuzione
N 4.2
Summary of Contents for 2006 Monster S2R 1000
Page 10: ......
Page 11: ...A B C D E F G H L M N P Generalit 0 Description 0...
Page 24: ......
Page 25: ...A B C D E F G H L M N P Informazioni sul modello 0 Model specific information 0...
Page 29: ...A B C D E F G H L M N P Caratteristiche tecniche 0 Technical specification 0...
Page 65: ...A B C D E F G H L M N P Uso e manutenzione 0 Use and Maintenance operations 0...
Page 129: ...A B C D E F G H L M N P Vestizione 0 Fairing 0...
Page 141: ...A B C D E F G H L M N P Comandi Dispositivi 0 Controls Devices 0...
Page 164: ......
Page 165: ...A B C D E F G H L M N P Ruote Sospensioni Freni0 Wheels Suspensions Brakes 0...
Page 219: ...A B C D E F G H L M N P Mototelaio 0 Frame 0...
Page 245: ...A B C D E F G H L M N P Impianto di alimentazione Scarico 0 Fuel system Exhaust system 0...
Page 281: ...A B C D E F G H L M N P Impianto iniezione accensione 0 Ignition injection system 1...
Page 306: ......
Page 307: ...A B C D E F G H L M N P Motore 0 Engine 1...
Page 460: ......
Page 461: ...A B C D E F G H L M N P Impianto elettrico 0 Electric system 0...
Page 530: ......
Page 531: ...A B C D E F G H L M N P Indice degli argomenti 0 Subject index 0...
Page 540: ......