Communication connectors and terminals
Installation and wiring
2 - 62
2.7
Communication connectors and terminals
2.7.1 PU
connector
Mounting the operation panel or parameter unit on the enclosure surface
Having an operation panel or a parameter unit on the enclosure surface is convenient. With a con-
nection cable, the operation panel or the parameter unit can be mounted to the enclosure surface
and connected to the inverter.
To connect the operation panel or the parameter unit to the inverter, use an option FR-CB2
, or a con-
nector (RJ-45 connector) and cable (communication cable) available on the market.
(To mount the operation panel, the optional connector (FR-ADP) is required.)
Securely insert one end of the connection cable until the stoppers are fixed.
Communication operation
Using the PU connector enables communication operation from a personal computer, etc. When the
PU connector is connected with a personal, FA or other computer by a communication cable, a user
program can run to monitor the inverter or read and write parameters.
Communication can be performed with the Mitsubishi inverter protocol (computer link operation).
For the details, refer to page 5-446.
I003011E
Fig. 2-43:
Connecting a parameter unit or the operation panel using a connection cable
NOTES
Refer to the following table when fabricating the cable on the user side. Keep the total cable
length within 20 m.
Commercially available products (as of February 2015)
U
P
D
W
F
F
T
S
Operation panel connection
connector (FR-ADP) (option)
Operation panel
(FR-DU08)
Parameter unit connection cable
(FR-CB2
)(option)
Parameter unit (FR-PU07)
(option)
Operation panel
(FR-LU08) (option)
Name
Model
Manufacturer
Communication cable
SGLPEV-T (Cat5e/300 m) 24AWG × 4P
Mitsubishi Cable Industries, Ltd.
RJ-45 connector
5-554720-3
Tyco Electronics
Содержание FR-F800
Страница 2: ......
Страница 4: ......
Страница 28: ...Related manuals Introduction 1 8 ...
Страница 104: ...Connection of stand alone option units Installation and wiring 2 76 ...
Страница 162: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Страница 720: ...Checking parameters changed from their initial values Initial value change list Parameters 5 558 ...
Страница 780: ...Measurement of main circuit voltages currents and powers Precautions for maintenance and inspection 7 20 ...
Страница 806: ...Outline dimension drawings Specifications 8 26 ...
Страница 833: ......