Parameters
(E) Environment setting parameters
FR-F800
5 - 93
NOTES
The Y95 signal turns ON when any of MT1, MT2 or MT3 is activated. It does not turn OFF unless all
of MT1, MT2 and MT3 are cleared.
If all of MT1, MT2 and MT3 are activated, they are displayed in the priority of "MT1 > MT2 > MT3".
The cumulative energization time is counted every hour. Energization time of less than 1 h is not
counted.
Changing the terminal assignment using Pr. 190 to Pr. 196 (output terminal function selection)
may affect the other functions. Set parameters after confirming the function of each terminal.
Parameters referred to
Pr. 190 to Pr. 196
(output terminal function selection)
=>
Содержание FR-F800
Страница 2: ......
Страница 4: ......
Страница 28: ...Related manuals Introduction 1 8 ...
Страница 104: ...Connection of stand alone option units Installation and wiring 2 76 ...
Страница 162: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Страница 720: ...Checking parameters changed from their initial values Initial value change list Parameters 5 558 ...
Страница 780: ...Measurement of main circuit voltages currents and powers Precautions for maintenance and inspection 7 20 ...
Страница 806: ...Outline dimension drawings Specifications 8 26 ...
Страница 833: ......