2. Monitor
2.1 POSITION
I
-20
Display item
Explanation
[POSITION]
X-12345.678
Y 12345.678
Z
0.000 #1
The relative value is the coordinate position using the machine zero
point as the reference.
The current position during execution and its abbreviation (if the
position is specific or is placed in specific state) are displayed.
#1~#4
(first to fourth reference point positions),
] [
(servo off state),
> <
(axis removed state)
MR
(mirror image) are displayed.
Whether the tool reference position (figure below (a)) or the current
position of the tool nose position (figure below (b)) that considers
offset, such as tool length offset amount or tool diameter
compensation amount, in the tool reference position is applied to
the display of the relative value can be selected with the parameter.
Workpiece offset
Machine
zero point
Workpiece
zero point
Relative value
(a)
(Machine position)
Displayed by tool reference
position
Workpiece
coordinate
Current value B
Tool reference position
Tool nose position
Relative value
(b)
Displayed by tool
nose position
Tool
The relative of the relation value counter display contents and the
parameters is as shown below.
0
Relative value
The compensation amount is considered
according to #1287 ext23/bit4,5 contents.
#1221 aux
05/bit7
1
Current value B
The counter of the POSITION screen
changes to the current value B.
S
12345 (2000)
T
1234
M
12
Fc 12000.00
The spindle rotation speed command value is displayed. The actual
spindle rotation speed is shown in ( ).
The tool command value is displayed.
The last four digits of the miscellaneous function command value
are displayed.
During interpolation feed, the speed in the current vector direction in
moving is displayed.
During independent axis feed, the speed of the axis with the highest
speed is displayed.
G00 X-345.67 Y345.67;
T1234;
N100 S5000M3;
N200 G00Z-100.;
Four blocks of the current program being executed are displayed.
The top block is an already executed block.
The subsequent three lines are the subsequent block program.
Summary of Contents for EZMotion-NC E60 Series
Page 1: ......
Page 15: ...I OPERATION SECTION ...
Page 361: ...II MACHINE OPERATION MANUAL ...
Page 399: ...III SETUP ...
Page 472: ...IV APPENDIXES ...
Page 510: ......