10.1 Setting of Temperature Program Test Conditions
10 - 16
NOTE
: Whenever the alternate gas is used in [Ash Test], you
must specify [Ash addition] and set a stage for
replacement with the normal gas.
Start Temp. : 550
C (or lower)
End Temp. : 550
C (or lower)
Ramp Time : 20 s
Gas flow
: 200 mL/min
Gas Type : Normal
Atomize Test
Performs measurement while raising the atomization
temperature in the atomization stage at the set intervals to
display a graph of absorption sensitivity (ABS and REF) at
the atomization temperature or that of repeatability (RSD).
Put a check mark for [Atomize Test] by clicking its check
box, and an atomization test can be performed under the
set conditions.
Fig. 10-12 Atomize Test Window
Set the following items.
Start/End Temp. (
C)
Enter the start/end temperature in the [Atomize Test].
Usually enter a temperature a few hundred degrees
lower than the default atomization temperature.
Input range: 50 to 2800
C
Max. Temp. (
C)
Enter the maximum temperature when raising the
atomization temperature at the set intervals the [Atomize
Test].
Usually enter a temperature a few hundred degrees
higher than the default atomization temperature or
2800
C.
Input range: 50 to 2800
C
Interval (
C)
Enter a heating interval for raising the atomization
temperature at the set intervals in the [Atomize Test].
Usually enter a value of about 100
C.
Input range: 50 to 500
C
Summary of Contents for ZA3000 Series
Page 423: ...9 3 5 9 11 Fig 9 14 Diagnosis Log Dialog Box ...
Page 449: ...10 5 Reflecting on Analysis Conditions 10 24 Fig 10 16 Method Window Unmark the checkbox ...
Page 455: ...INDEX 4 V Verify 3 34 W Working curve graph 4 1 Wavelength accuracy 9 1 ...
Page 456: ...INSTRUCTION MANUAL 7J1 9027 000 Ver 1 February 2016 MODEL HFS 4 HYDRIDE FORMATION SYSTEM ...