1.1
1 - 1
1. STARTUP
The procedure below should be implemented prior to supplying
power to the spectrometer
1.1 Check of Instrument
On the main unit of atomic absorption spectrophotometer,
perform the following checks.
(1) Is each unit of the instrument (main unit and PC) connected
properly?
For cable connection, coolant piping and gas piping, refer
to the maintenance edition.
(2) Isn’t the quartz window contaminated?
Remove the quartz window from electrode section. If the
window is contaminated, it must be cleaned.
(3) Is the graphite cuvette mounted properly in the atomizing
furnace?
For using the already mounted graphite cuvette, make sure
the cuvette is mounted exactly between the electrode rings,
the cuvette has not yet been deteriorated and its sample
injection port faces upward.
Various types of cuvettes are available. Be sure to check
the type before using it. For mounting the cuvette newly,
follow the instructions given in “1.4 Graphite Cuvette
Installation.”
(4) Is the waste solution bottle of autosampler filled?
Empty the waste solution bottle before measurement.
(5) Is rinsing solution supplied into the rinsing solution bottle of
autosampler?
Replace with the new rinsing solution before measurement.
(6) Is sufficient amount of gas left to be used?
(7) Is paper set in the printer?
Does ink or toner have run out?
For details, refer to the instruction manual of your printer.
Summary of Contents for ZA3000 Series
Page 423: ...9 3 5 9 11 Fig 9 14 Diagnosis Log Dialog Box ...
Page 449: ...10 5 Reflecting on Analysis Conditions 10 24 Fig 10 16 Method Window Unmark the checkbox ...
Page 455: ...INDEX 4 V Verify 3 34 W Working curve graph 4 1 Wavelength accuracy 9 1 ...
Page 456: ...INSTRUCTION MANUAL 7J1 9027 000 Ver 1 February 2016 MODEL HFS 4 HYDRIDE FORMATION SYSTEM ...