3.6 Flowing of Cooling Water
Supply cooling water to the instrument. When the cooling water
is supplied for the first time on the day of measurement, the
following dialog box will appear. Check for water leaks. If no
leaks are found, click [OK].
Fig. 3-45 Dialog Box for Checking for
Water Leaks from the Sample Line
NOTES
: 1. A water flow of about 2 L/min is required within a
water pressure range from 35 to 50 kPa (about
0.35 to 0.5 kgf/cm
2
). If the temperature of
cooling water is much lower than the room
temperature, condensation of water vapor in the
air may occur on the quartz window of atomizer,
resulting in degradation of the components and
defective data. Water temperature should be
limited within ±5 °C of the room temperature.
2. Cooling water should be supplied shortly before
measurement for preventing condensation.
Summary of Contents for ZA3000 Series
Page 423: ...9 3 5 9 11 Fig 9 14 Diagnosis Log Dialog Box ...
Page 449: ...10 5 Reflecting on Analysis Conditions 10 24 Fig 10 16 Method Window Unmark the checkbox ...
Page 455: ...INDEX 4 V Verify 3 34 W Working curve graph 4 1 Wavelength accuracy 9 1 ...
Page 456: ...INSTRUCTION MANUAL 7J1 9027 000 Ver 1 February 2016 MODEL HFS 4 HYDRIDE FORMATION SYSTEM ...