CHAPTER 2 WIRING
2-4
Configuration
2
Servo amplifier (frame3)
Servo amplifier (frame4)
L1 L2 L3 P(+)
N(-)
RB1 RB2 RB3 U V W
Sequence I/O (CN1)
Encoder wiring (CN2)
Battery wiring (CN5)
Battery and the case
(option)
Main circuit
(TB2)
- P-N junction
- Regenerative
resistor
Power supply
(TB1)
- Main power
Analog monitor (CN4)
The analog waveform is monitored.
Motor power
(TB3)
RS-485 (CN3A (IN), CN3B (OUT))
Upper side: CN3A, lower side: CN3B
Charge LED
L1
L2
L3
P(+)
RB1
RB2
RB3
N(-)
U
V
W
Keypad
4-digit 7-segment LED, 4 buttons and monitor
terminals are installed.
Grounding terminal (2 pcs)
(Screw size : M4)
TB2(Screw size : M4)
Grounding terminal
(Screw size : M4)
Grounding terminal
(Screw size : M4)
TB1(Screw size : M4)
Analog monitor (CN4)
The analog waveform is monitored.
Keypad
4-digit 7-segment LED, 4 buttons and monitor
terminals are installed.
RS-485 (CN3A (IN), CN3B (OUT))
Upper side: CN3A, lower side: CN3B
Sequence I/O (CN1)
Encoder wiring (CN2)
Battery wiring (CN5)
Charge LED
Battery and the case
(option)
Summary of Contents for ALPHA5 Smart
Page 1: ...24C7 E 0016c FUJI SERVO SYSTEM ALPHA5 Smart USER S MANUAL...
Page 2: ......
Page 4: ...ii...
Page 36: ...CHAPTER 0 INTRODUCTION 0 16 Combination between Servomotor and Servo Amplifier 0...
Page 276: ...CHAPTER 4 PARAMETER 4 108 Output Terminal Function Setting Parameter 4...
Page 368: ...CHAPTER 6 KEYPAD 6 56 Test Operation Mode 6...
Page 392: ...CHAPTER 7 MAINTENANCE AND INSPECTION 7 24 Troubleshooting 7...
Page 472: ...CHAPTER 11 ABSOLUTE POSITION SYSTEM 11 8 Calculation of Battery Life 11...
Page 488: ...CHAPTER 12 POSITIONING DATA 12 16 Response Time 12...
Page 592: ...CHAPTER 14 PC LOADER 14 48 Parameter Conversion Tool 14 1 2 3 4 6 7 8 9 10 11...
Page 633: ...CHAPTER 15 APPENDIXES Product Warranty 15 41 15 15 9 Product Warranty...
Page 634: ...CHAPTER 15 APPENDIXES 15 42 Service Network 15 15 10 Service Network...
Page 635: ......