![ABB RELION 650 SERIES Technical Manual Download Page 466](http://html.mh-extra.com/html/abb/relion-650-series/relion-650-series_technical-manual_2122466.webp)
AND
OR
OR
OR
AND
AND
t
tPickUpWEI
t
200 ms
AND
AND
t
1500 ms
CBOPEN
VTSZ
WEIBLK1
WEIBLK2
CRL
BLOCK
t
50 ms
t
200 ms
WEI = Echo
ECHO
CR
IEC09000032-6-en.vsd
IEC09000032 V6 EN-US
Figure 236:
Simplified logic diagram for weak-end infeed logic - Echo
With the WEI=
Echo & Trip
setting, the logic sends an echo according to the
diagram above. Further, it activates the TRWEI signal to trip the breaker if the echo
conditions are fulfilled and the neutral point voltage is above the set operate value
for
3U0>
.
The voltage signal that is used to calculate the zero sequence voltage is set in the
earth fault function which is in operation.
AND
OR
OR
OR
AND
AND
t
tPickUpWEI
t
200 ms
AND
AND
t
1500 ms
CBOPEN
VTSZ
WEIBLK1
WEIBLK2
CRL
BLOCK
t
50 ms
t
200 ms
WEI = Echo&Trip
ECHO
IEC09000020-6-en.vsd
AND
3U0>
a>b
t
15 ms
TRWEI
ST3U0
IEC09000020 V6 EN-US
Figure 237:
Simplified logic diagram for weak-end infeed logic - Echo & Trip
Section 12
1MRK 506 382-UEN A
Scheme communication
460
Line distance protection REL650 2.2 IEC
Technical manual
Summary of Contents for RELION 650 SERIES
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Technical manual ...
Page 2: ......
Page 46: ...40 ...
Page 56: ...50 ...
Page 164: ...158 ...
Page 264: ...258 ...
Page 304: ...298 ...
Page 320: ...314 ...
Page 338: ...332 ...
Page 438: ...432 ...
Page 468: ...462 ...
Page 534: ...528 ...
Page 646: ...640 ...
Page 660: ...654 ...
Page 676: ...670 ...
Page 800: ...794 ...
Page 836: ...830 ...
Page 890: ...884 ...
Page 894: ...888 ...
Page 940: ...934 ...
Page 941: ...935 ...