![ABB RELION 650 SERIES Technical Manual Download Page 380](http://html.mh-extra.com/html/abb/relion-650-series/relion-650-series_technical-manual_2122380.webp)
IEC16000160-1-en.vsdx
Priority
AND
OR
High (Master)
inProgress
unsuccessful
WFMASTER
Master:
Slave:
Priority
Low (Slave)
AND
AND
start
WAIT
t
tWaitForMaster
AND
AND
S
R
OR
inhibit
commandCloseCB
reclaimTimeStarted
inhibitWaitForMaster
slaveDeadTime
wait
IEC16000160 V1 EN-US
Figure 183:
Master-Slave
If reclosing of the first circuit breaker is unsuccessful, the
UNSUCCL
output
connected to the
INHIBIT
input of the slave unit interrupts the reclosing sequence
of the latter. The signals can be cross-connected to allow simple changing of the
priority by just setting the High and the Low priorities without changing the
configuration. The
CBCLOSED
inputs from each circuit breaker are important in
multi-breaker arrangements to ensure that the circuit breaker was closed at the
beginning of the sequence. If the High priority breaker was not closed its auto
reclosing sequence will not start and the low priority breaker will just continue its
auto reclosing sequence in accordance with its normal settings.
11.2.6.5
Time sequence diagrams
M12458-10 v5
Some examples of the timing of internal and external signals at typical transient
and permanent faults are shown below in Figure
to
.
Section 11
1MRK 506 382-UEN A
Control
374
Line distance protection REL650 2.2 IEC
Technical manual
Summary of Contents for RELION 650 SERIES
Page 1: ...RELION 650 SERIES Line distance protection REL650 Version 2 2 Technical manual ...
Page 2: ......
Page 46: ...40 ...
Page 56: ...50 ...
Page 164: ...158 ...
Page 264: ...258 ...
Page 304: ...298 ...
Page 320: ...314 ...
Page 338: ...332 ...
Page 438: ...432 ...
Page 468: ...462 ...
Page 534: ...528 ...
Page 646: ...640 ...
Page 660: ...654 ...
Page 676: ...670 ...
Page 800: ...794 ...
Page 836: ...830 ...
Page 890: ...884 ...
Page 894: ...888 ...
Page 940: ...934 ...
Page 941: ...935 ...