Start-up and control through the I/O interface
25
It is recommended not to press any control panel keys during the ID run. However:
• The Motor ID run can be stopped at any time by pressing the control panel stop
key (
).
• After the ID run is started with the start key (
), it is possible to monitor the
actual values by first pressing the
ACT
key and then a double-arrow key (
).
• After the STANDARD ID run is completed, the brake is closed.
• After the motor STANDARD ID run is successfully completed, the speed
controller parameters (Group 23 SPEED CTRL) are updated to optimized settings
for the crane applications. Parameter
GAIN is set to 15 and parameter
INTEGRATION TIME to 0.5 s. You can change these settings afterwards
manually.
Note:
If parameter group 99 gets locked, the following warning message is
displayed: WRITE ACCESS DENIED. PARAMETER SETTING NOT POSSIBLE.
• Group 99 gets locked once the ID run is completed successfully. The group can
be unlocked, if required, by entering pass code 584 into parameter
PASS
CODE.
Note
: Actual signal 03.03 bit 7 (IDENTIF RUN DONE) is displayed if the STANDARD
ID run is done (the motor ID run is successfully completed).
Summary of Contents for ACS 800 Series
Page 1: ...ACS800 Firmware Manual Crane Control Program N697 ...
Page 4: ......
Page 26: ...Start up and control through the I O interface 26 ...
Page 36: ...Quick start up guide 36 ...
Page 52: ...Control panel 52 ...
Page 105: ...Program features 105 Figure Control diagram for Shaft synchronisation executed in 20 ms ...
Page 128: ...Program features 128 ...
Page 150: ...Application macros control location EXT1 EXT2 150 ...
Page 228: ...Actual signals and parameters 228 ...
Page 299: ...Adaptive Programming examples for crane control 299 ...
Page 305: ...Adaptive Programming examples for crane control 305 ...
Page 318: ...Analogue Extension Module 318 ...
Page 332: ...Additional data actual signals and parameters 332 ...
Page 334: ...DriveWindow 334 ...
Page 335: ...Control block diagrams 335 Control block diagrams ...
Page 336: ...Control block diagrams 336 ...
Page 337: ...Control block diagrams 337 ...
Page 338: ...Control block diagrams 338 ...
Page 340: ...www abb com drives www abb com drivespartners Contact us 3AFE68775230 Rev E EN 2012 09 25 ...