Actual signals and parameters
153
01.32
PP 3 TEMP
Measured heatsink temperature in inverter no. 3 (used only in high power
units with parallel inverters).
1 = 1 °C
01.33
PP 4 TEMP
Measured heatsink temperature in inverter no. 4 (used only in high power
units with parallel inverters).
1 = 1 °C
01.35
MOTOR 1 TEMP
Measured temperature of motor 1. See parameter
AI1 SEL.
1 = 1 °C
01.36
MOTOR 2 TEMP
Measured temperature of motor 2. See parameter
MOT 2 TEMP
AI2 SEL.
1 = 1 °C
01.37
MOTOR TEMP EST
Estimated motor temperature. Signal value is saved at power switch off.
1 = 1 °C
01.38
AI5 [mA]
Value of analogue input AI5 read from AI1 of the analogue I/O extension
module (optional). A voltage signal is also displayed in mA (instead of V).
1 = 0.001 mA
01.39
AI6 [mA]
Value of analogue input AI6 read from AI2 of the analogue I/O extension
module (optional).
A voltage signal is also displayed in mA (instead of V).
1 = 0.001 mA
01.40
DI15-7 STATUS
Status of digital inputs DI15 to DI7 read from the digital I/O extension
modules (optional). For example, value 000000001: DI7 is on, DI8 to
DI15 are off.
1 = 1
01.41
EXT RO STATUS
Status of the relay outputs on the digital I/O extension modules (optional).
For example, value 0000001: RO1 of module 1 is energised. Other relay
outputs are de-energised.
1 = 1
01.42
PROCESS SPEED REL
Motor actual speed in percent of the Absolute Maximum Speed. If
parameter
MOTOR CTRL MODE is SCALAR, the value is the
relative actual output frequency.
1 = 1
01.43
CRANE OPT TIME
Crane operation time counter. The counter runs when the inverter
modulates. Can be reset with parameter
RESET OPT TIME.
1 = 10 h
01.44
FAN ON-TIME
Running time of the drive cooling fan.
Note:
Resetting of the counter is recommended when the fan is replaced.
For more information, contact your local ABB representative.
1 = 10 h
01.45
CTRL BOARD TEMP
Control board temperature.
1 = 1°C
01.46
OEM SIGNAL
Text defined in parameter
OEM SIGNAL. Can be used for
displaying in the control panel.
02 ACTUAL SIGNALS
Speed and torque reference monitoring signals.
02.01
SPEED REF 2
Limited speed reference. 100% corresponds to the Absolute Maximum
Speed of the motor.
0 = 0% 20000
= 100% of
motor
absolute max.
speed
02.02
SPEED REF 3
Ramped and shaped speed reference. 100% corresponds to the
Absolute Maximum Speed of the motor.
20000 = 100%
02.09
TORQUE REF 2
Speed controller output. 100% corresponds to the motor nominal torque. 0 = 0% 10000
= 100% of
motor nominal
torque
02.10
TORQUE REF 3
Torque reference. 100% corresponds to the motor nominal torque.
10000 = 100%
02.13
TORQ USED REF
Torque reference after frequency, voltage and torque limiters. 100%
corresponds to the motor nominal torque.
10000 = 100%
02.14
FLUX REF
Flux reference in percent.
10000 = 100%
02.17
SPEED ESTIMATED
Estimated motor speed. 100% corresponds to the Absolute Maximum
Speed of the motor.
20000 = 100%
No.
Name/Value
Description
FbEq
Summary of Contents for ACS 800 Series
Page 1: ...ACS800 Firmware Manual Crane Control Program N697 ...
Page 4: ......
Page 26: ...Start up and control through the I O interface 26 ...
Page 36: ...Quick start up guide 36 ...
Page 52: ...Control panel 52 ...
Page 105: ...Program features 105 Figure Control diagram for Shaft synchronisation executed in 20 ms ...
Page 128: ...Program features 128 ...
Page 150: ...Application macros control location EXT1 EXT2 150 ...
Page 228: ...Actual signals and parameters 228 ...
Page 299: ...Adaptive Programming examples for crane control 299 ...
Page 305: ...Adaptive Programming examples for crane control 305 ...
Page 318: ...Analogue Extension Module 318 ...
Page 332: ...Additional data actual signals and parameters 332 ...
Page 334: ...DriveWindow 334 ...
Page 335: ...Control block diagrams 335 Control block diagrams ...
Page 336: ...Control block diagrams 336 ...
Page 337: ...Control block diagrams 337 ...
Page 338: ...Control block diagrams 338 ...
Page 340: ...www abb com drives www abb com drivespartners Contact us 3AFE68775230 Rev E EN 2012 09 25 ...