Program features
89
• The torque proving sequence can start when the input signal RUNNING (B3 of
actual signal
) is ”1”, in other words, when the converter is in operation. After
a successful sequence, the output signal TORQ PROV OK changes to “1”.
• If the function detects a fault during the sequence, it keeps the signal TORQ
PROV OK in value “0”, changes the signal TORQ PROVE FLT to “1” and trips the
drive.
• Torque proving reference is fixed to 30% of the motor torque (signal TORQ PROV
REF below).
• The torque proving reference is changed from 30 % to 10 % if the High-end limit
(parameter
HIGHEND PTR) is true and the drive receives a new start
signal given by the operator.
• The actual torque is read from the signal MOT TORQ (signal
Settings
Diagnostics
Parameter
Additional information
...
Activates the monitoring
Fault delay time
Other
Parameters
should be active.
Actual signal
Additional information
bit 2
Torque prove fault bit
Faults
Torque proving not successful
MOTOR TORQUE (1.05)
Running
<TORQ PROV REF>
<TORQ PROV SEL>
Torq prov OK
Torq prov flt
Torq prov ref
&
S
R
<TORQ PROV FLT TD>
I
O
> 1
_
<TORQ PROV SEL>
Summary of Contents for ACS 800 Series
Page 1: ...ACS800 Firmware Manual Crane Control Program N697 ...
Page 4: ......
Page 26: ...Start up and control through the I O interface 26 ...
Page 36: ...Quick start up guide 36 ...
Page 52: ...Control panel 52 ...
Page 105: ...Program features 105 Figure Control diagram for Shaft synchronisation executed in 20 ms ...
Page 128: ...Program features 128 ...
Page 150: ...Application macros control location EXT1 EXT2 150 ...
Page 228: ...Actual signals and parameters 228 ...
Page 299: ...Adaptive Programming examples for crane control 299 ...
Page 305: ...Adaptive Programming examples for crane control 305 ...
Page 318: ...Analogue Extension Module 318 ...
Page 332: ...Additional data actual signals and parameters 332 ...
Page 334: ...DriveWindow 334 ...
Page 335: ...Control block diagrams 335 Control block diagrams ...
Page 336: ...Control block diagrams 336 ...
Page 337: ...Control block diagrams 337 ...
Page 338: ...Control block diagrams 338 ...
Page 340: ...www abb com drives www abb com drivespartners Contact us 3AFE68775230 Rev E EN 2012 09 25 ...