Quick start-up guide
34
• Select the start/stop control as COMM.CW, if the Master command is to be used
(Par.
).
• Select the direction control as REQUEST (Par.
).
• Select the drive reference control as COMM.REF(Par.
).
• Set the minimum reference limits (Par.
).
• Set the maximum reference limits (Par.
• Select the CH2 link topology as ring (Par.
). Select the Synchro control as
ON (Par.
).
• Select the synchro input (Par.
• Set the synchro gain (Par.
• Set the shaft scaling factor for the scaling of speed reference received from the
Master (Par.
).
• Set the position scaling factor (Par.
• Set the maximum position correction limit in mm (Par.
• Set the minimum position correction limit in mm (Par.
• Set the synchronisation error limit for the Follower drive (Par.
• Set the synchro correction scale in terms of rpm equivalent to 1 mm position error
(Par.
).
• Set the synchro correction mode (Par.
• Set the position hysteresis value (Par.
)
Load speed control configuration
This section explains how the Load speed control function parameters have to be
configured. See section
for detailed explanation.
Checklist for Load speed control configuration
• Activate the Load speed control function (Par.
• Set the motor base speed (Par.
). This is the speed at which the actual
motor current is checked with the load for calculating the maximum allowed
speed.
• Set the hold ramp time period (Par.
). The speed reference is on hold at the
base speed for this period. The motor current at the base speed is checked after
this time period.
• Set the current values for the forward direction (Par.
can be set with the empty hook current at the base speed
when running in the forward direction. Par.
can be set with the maximum
load current at the base speed in the forward direction. These parameters are to
be entered in the increasing order in the above sequence. For more details, see
section
.
Summary of Contents for ACS 800 Series
Page 1: ...ACS800 Firmware Manual Crane Control Program N697 ...
Page 4: ......
Page 26: ...Start up and control through the I O interface 26 ...
Page 36: ...Quick start up guide 36 ...
Page 52: ...Control panel 52 ...
Page 105: ...Program features 105 Figure Control diagram for Shaft synchronisation executed in 20 ms ...
Page 128: ...Program features 128 ...
Page 150: ...Application macros control location EXT1 EXT2 150 ...
Page 228: ...Actual signals and parameters 228 ...
Page 299: ...Adaptive Programming examples for crane control 299 ...
Page 305: ...Adaptive Programming examples for crane control 305 ...
Page 318: ...Analogue Extension Module 318 ...
Page 332: ...Additional data actual signals and parameters 332 ...
Page 334: ...DriveWindow 334 ...
Page 335: ...Control block diagrams 335 Control block diagrams ...
Page 336: ...Control block diagrams 336 ...
Page 337: ...Control block diagrams 337 ...
Page 338: ...Control block diagrams 338 ...
Page 340: ...www abb com drives www abb com drivespartners Contact us 3AFE68775230 Rev E EN 2012 09 25 ...