Program features
90
Power ON acknowledge and internal fault reset
The Power ON Ack signal (usually from the main contactor auxiliary contact) is, by
default, programmed to the DIL input on the RMIO board. For more information, see
section
and
Additional information for Digital
.
If the Power ON Ack signal is not connected, the drive is not ready for start.
After the Power ON Ack signal is closed (digital input DIL is TRUE = 1), the drive
generates one internal fault reset after the time defined with parameter
POWER ON RESET TD.
The wiring diagram for the Power ON acknowledge signal is shown below.
Settings
Parameters
Internal fault reset
Power ON acknowledge
16.12
Summary of Contents for ACS 800 Series
Page 1: ...ACS800 Firmware Manual Crane Control Program N697 ...
Page 4: ......
Page 26: ...Start up and control through the I O interface 26 ...
Page 36: ...Quick start up guide 36 ...
Page 52: ...Control panel 52 ...
Page 105: ...Program features 105 Figure Control diagram for Shaft synchronisation executed in 20 ms ...
Page 128: ...Program features 128 ...
Page 150: ...Application macros control location EXT1 EXT2 150 ...
Page 228: ...Actual signals and parameters 228 ...
Page 299: ...Adaptive Programming examples for crane control 299 ...
Page 305: ...Adaptive Programming examples for crane control 305 ...
Page 318: ...Analogue Extension Module 318 ...
Page 332: ...Additional data actual signals and parameters 332 ...
Page 334: ...DriveWindow 334 ...
Page 335: ...Control block diagrams 335 Control block diagrams ...
Page 336: ...Control block diagrams 336 ...
Page 337: ...Control block diagrams 337 ...
Page 338: ...Control block diagrams 338 ...
Page 340: ...www abb com drives www abb com drivespartners Contact us 3AFE68775230 Rev E EN 2012 09 25 ...