High Technology, Inc.
109 Production Road,
Walpole MA 02081 USA
Document Number
OM-E-FC-360-30
Revision Level
Rev. 3
Prepared by
J.S. Bolio
Approved by
S. Titov
Effective Date
8/15/2016
Operator’s Manual: HTI BioChem FC-360
HIGH TECHNOLOGY, INC. PROPRIETARY AND CONFIDENTIAL
Page 9 of 222
Connect the instrument to the computer and its peripherals before connecting to the supply line. If the
above requirements are not met, the quality of results may be affected.
Warning: Make sure that ground connection in the line meets the standard requirements for its
operating power. Not performing ground connection poses significant safety risk for the operator
and may damage one or several parts of the equipment or the computer.
Warning: Waste solution tubing must be placed correctly so that it drains by gravity. They must
not be curved and/or collapsed.
Warning: The instrument must be connected to a PC which meets the requirements previously
mentioned.
Warning: The instrument has been tested with a tensioactive solution which is added to the
distilled water. Not using or altering the product or its dilution will affect the operation of the
instrument.
Wires and Tubing Connection
Figure 2-1
1. Connect the interlock to 100~220V, 50~60Hz supply.
If line variations are higher than 10%, a ferroresonant voltage regulator or a 1500 VA uninterruptible
power supply (UPS sine wave output) is recommended.
2. Connect the RS-232 wire to the PC before switching on the instrument.
For analyzers with ISE Module installed continue with step (3). Otherwise go to step (8)
3. Connect the ISE module connector to the reagent Kit.
4. Remove all electrodes from sealed bags.
5. Remove tape from K+ and Li+ electrode.