High Technology, Inc.
109 Production Road,
Walpole MA USA 02081
Document Number
OM-E-FC-360-30
Revision Level
Rev. 3
Prepared By
J.S. Bolio
Approved By
S. Titov
Effective date
8/15/2016
Operator’s Manual: HTI BioChem FC-360
Page 150 of 217
HIGH TECHNOLOGY, INC. PROPRIETARY AND CONFIDENTIAL
This cycle must be carried out:
-
every 8 hours
-
after each Clean Cycle
-
if the QC sample results do not repeatedly fall within the proper ranges
12.8.5.5
Clean
Place a tube with cleaning solution in the required position, then press ok. This cycle is used to remove
protein build-up from the ISE Module electrodes.
Figure 12-56
This cycle must be carried out:
-
once per 24-hour period
-
after every 50 samples
12.8.5.6
Pumps Calibration
Place a tube with saline solution in the required position, and then press ok. This cycle is used to
calibrate the peristaltic pumps of the ISE Module.
Figure 12-57
This cycle must be carried out:
-Once per day