High Technology, Inc.
109 Production Road,
Walpole MA USA 02081
Document Number
OM-E-FC-360-30
Revision Level
Rev. 3
Prepared By
J.S. Bolio
Approved By
S. Titov
Effective date
8/15/2016
Operator’s Manual: HTI BioChem FC-360
Page 182 of 217
HIGH TECHNOLOGY, INC. PROPRIETARY AND CONFIDENTIAL
15.5.3.8
Diluter Liquid Diaphragm Pump Membrane Replacement
Contact Technical Support
15.5.3.9
Cuvettes replacement
1. Turn off the analyzer.
2. Remove the metal nuts that hold the cuvette strips. Remove all cuvette strips.
Warning: avoid the metal nuts fall inside the analyzer during this procedure.
3. Place the new cuvette strips and adjust the metal nuts properly.
4. Turn on the analyzer.
5. Purge the Diluter
(Maintenance
Instrument
Diluter Purge)
6. Calibrate all cuvettes
(Maintenance
Instrument
Calibration
select
Calibrate Cuvettes
Range 1 a 100
select the position of the solution that will be used for calibration Ex.:
Use
Container
Calibrate)
As needed maintenance
Database Initialization (every 10.000 tests)
1. Select
Maintenance Menu
Settings
Enter password
Database
Refresh Statistics
In the
lower part of the tab, are shown the numbers of patients, calibrators, and controls samples for the
database in use. The Total is also shown, with the inclusion of the previous results. In the adjacent
box the
Total
value corresponds to the sum of all the determinations in the database in use. These
numbers are updated with the
Refresh Statistics
command. Before the total number of
determinations reaches the 10.000, the database must be initialized: steps 2), 3) and 4)
Figure 15-3