Leak Back Test
1. Perform the Leak Back Test in AutoTest.
2. Verify system leak back rate is less than 25 mTorr per minute.
4. If the test fails, inspect the system for leaks
Master Reset
CAUTION: Do not perform a master reset when a cycle is in
progress. Only perform this procedure when the
system is in the idle state.
1. Defeat the safety interlock, remove the AutoTest board and install the
system microprocessor board.
2. Apply power to the enclosure by enabling the safety interlock and
pressing CANCEL simultaneously.
3. Continue to hold CANCEL until you hear the beep signal, then
release.
4. Remove the cassette collection box. Wait for the beep tone and then
reinstall the empty box.
Heater Voltages and Temperatures
Following are procedures for testing the vaporizer heater voltage, the
door heater temperature and the chamber heaters temperatures. Be
sure to perform these procedures in the sequence given.
F
Temperature Continuity Check
F
Vaporizer Heater Voltage
F
Door Temperature
F
Chamber Temperature
F
Block 2 Door and Chamber Temperatures
Product Certification
Certification Procedures
13-10
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......