7. On Block 2 systems, wrap the outside of the feedthrough port with
tape to block off the air holes.
8. From the outside the chamber, install the feedthrough until the tool
touches the chamber feedthrough port. The O-rings hold it in place.
9. Mask the area around the feedthrough port inside the chamber to
prevent the epoxy from spilling on the chamber.
10. Carefully and slowly pour the adhesive into the feedthrough opening.
Be careful not to trap air while pouring. Use a metal probe to break
any trapped air pockets.
Figure 7-8. Feedthrough Diagram
Figure 7-9. Block 2 Feedthrough
Removal/Replacement
Door and Chamber Subsystem
ASP Service Guide rev D
STERRAD® 100 Sterilizer
7-25
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......