
7. Install the AutoTest board and start the
vacuum RF test.
8. During pump down, the pressure display on the TM 20 drops below
10 mTorr within 15 minutes.
9. During the test, the pressure displayed on the LCD should remain
stable. This is the value of the Baratron. The zero pot should be
adjusted to equal the value measured by the TM-20 vacuum gauge.
10. After completion of the test remove the gauge, re-assemble the
vacuum pump.
11. Perform a complete leak back test. If the test fails, inspect the
system for leaks.
Figure 13-2. Baratron Test Equipment
Product Certification
Certification Procedures
13-8
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......