19. This is the point where you need the second person to help you. Have
the second person hold the door and simultaneously, move the left
guide rail out and lift the door up and out. Be careful not to snag the
wrapped cables. Set the removed door aside where it cannot be
damaged. Move the guide rail back into place but do not tighten.
Remove the Guide Rail
1. Remove the screw at the left side of the upper panel bracket, and
rotate the bracket out of the way.
2. Loosen the left guide rail enough to install the door assembly.
3. Lower the door to the fixed stop and re-attach the left guide rail
assembly and the upper panel bracket. Be sure that the glide
buttons are still trapped in place over the fascia screw heads. More
adjustments are made later in this procedure
Replace the Door
1. Place 2 glide buttons over the two lowest screws retaining the fascia
to the door. You may use a small amount of vacuum grease to hold
the buttons in place until they are installed on the guide rails. Be
sure to Remove the guide rails before proceeding.
2. Set the door in place and make sure the left guide rail and cross bars
are in place and supporting it.
3. Make sure the end of the bar on Block 2 systems engages the
opening on the left rail.
4. After the rails are securely fastened, place the door into the service
position.
5. Using the alignment tools, align the rails so that the door tracks
smoothly when operated. On Block 2 systems, used the attached
alignment tool to align the rail to the frame.
6. Reconnect the ground.
7. If the chamber is out of alignment following door replacement, it
should be aligned at this point.
8. Adjust and tension the door cables running between the door pulleys
and guide rails so that the door hangs evenly and operates smoothly.
The door should be able to easily move side-to-side while raising or
lowering. It should not ride or rest on the side of one guide rail when
the cables are correctly adjusted. The cables should only be
tightened enough to allow the door to hang and operate smoothly,
they should not be over tightened as this stretches the cables and
stresses the brackets and pulleys.
9. Adjust the door cylinder cables. Tighten the cable to remove all slack
but not to tension. There should be no play under the locknuts.
10. Manually raise the door and adjust the door stops so that the door
over-center mechanism extends and evenly closes the door against
the O-ring.
Removal/Replacement
Door and Chamber Subsystem
ASP Service Guide rev D
STERRAD® 100 Sterilizer
7-17
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......