Certification Procedures
Be sure to perform all certification procedure in sequence. This is
particularly important for the heater voltages and temperatures.
F
System Preparation
F
Power Supplies Verification
F
Analog to Digital Set Point Verification
F
High-Low Pressure Range Divider Voltage Verification
F
Baratron Zero Shift Test
F
RF Power Test
F
Leak Back Test
F
Compressor Pressure Switch Verification
F
Cassette Optics Test
F
Injector Pump Floating Guide Check
F
Master Reset
F
Heater Voltages and Temperatures
F
Vaporizer Heater Voltage Verification
F
Door Temperature
F
Chamber Temperature
F
Block 2 Door and Chamber Temperatures
System Preparation
1. Remove the access panels from the control enclosure and apply
power to the enclosure by enabling the safety interlock.
Product Certification
Certification Procedures
13-4
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......