
Compressor Pressure Switch Test
This test verifies the pneumatics compressor starting and shut off
pressure.
1. While pressing upwards on the button at the bottom of the pressure
regulator moisture trap, monitor the pressure gauge.
2. Verify the compressor starts at 60 PSI ±3 PSI.
3. Verify the compressor shuts off at 80 PSI ±3 PSI.
Power Supplies Test
This test verifies the performance of the power supplies.
1. Connect DMM leads to the terminal block located on the connector
distribution board as indicated in the tables below:
Block 1.8 with/without 100 S Upgrade
Voltage to be
Measured
Positive Lead
Negative Lead
Acceptable Range
+5.2V
Terminal 2
Terminal 1
+5.18 to +5.22
+12.85V
Terminal 3
Terminal 1
+12.80 to +12.90
-12 V (REF)
Terminal 4
Terminal 1
-12.0 VDC ±10%
Block 2.0 with/without 100 S Upgrade
4
Note: Test points are very close together so make sure you use
the proper connections. Measure voltage at the connector
distribution board test point. Adjust trimpots on PS1
(rear, lower point) for pin 2 and PS2 (front, raised point)
and for pin 3 as shown in the table below.
Voltage to be
Measured
Positive Lead
Negative Lead
Acceptable Range
+5.2 VDC ±0.02 VDC
Pin #3
Pin #1
+5.18 to +5.22 VDC
+12.85 VDC ±0.05
VDC
Pin #4
Pin #1
+12.80 to +12.90 VDC
Certification Procedures
Product Certification
ASP Service Guide rev. D
STERRAD® 100 Sterilizer
13-5
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......