Vacuum Subsystem Tests
Display
VAC_RF W/ START
NEXT Menu W/ LONG CANCEL
Action
F
Press
START
.
Pump Rotation Tests
Display
CHECK PUMP ROTATION
W/ START or NEXT W/CANCEL
Action
F
Press
START
.
F
Verify that air is flowing out of the exhaust port. The motor rotates
for 10 seconds.
Corrective Action
F
Check the hospital wiring for correct (CBA) phase rotation.
F
Press motor starter override to start pump.
F
Check the wiring.
F
Replace the solid state relay board.
F
Replace the motor starter.
Display
PUMP IS ON
NEXT W/ LONG CANCEL
Action
Press a
LONG
CANCEL.
Vacuum Subsystem Tests
AutoTest
ASP Service Guide rev D
STERRAD® 100 Sterilizer
B-33
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......