Corrective Action
F
Adjust pawl assembly by loosening the screws holding the solenoid
and lift it up to the maximum height. Retighten screws.
F
Check voltage at J102, should be 12 VDC.
F
Replace the injector pump.
Display
RELEASE PAWL W/ START
NEXT OUTPUT W/ CANCEL
Action
F
Press
START
. Verify that pawl has dropped under its own weight
and engages cassette.
F
Press down lightly on seal base and verify that 0.2 mm minimum
clearance exists between the seal base O-ring and the top of a
cassette.
Corrective Action
If clearance is not correct, replace injector pump.
Display
LIFT PAWL W/ START
NEXT OUTPUT W/ CANCEL
Action
F
Press
CANCEL
.
F
Remove cassette.
Motor Test
Display
ON/OFF MOTOR IN W/ START
NEXT OUTPUT W/ CANCEL
Action
F
Observe the cassette as it travels through the pump.
F
Observe floating guide gap. It should be within specifications.
F
Press
START.
Injection and Pneumatics Tests
AutoTest
ASP Service Guide rev D
STERRAD® 100 Sterilizer
B-15
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......