
Pneumatics Calibration
IMPORTANT!:
Your first step when servicing a system is to verify that
the system is
properly connected to the power source
, and to make
sure all the
subsystems are properly connected to the AC
system and
all circuit breakers are on and functioning normally. Once you have
verified these things, proceed with your calibration steps.
Pneumatics Pressure Switch
4
Note:
You do not need to remove the front panel to calibrate the
pneumatic switch on a
Block 2
device.
1. Remove the cover from the pneumatic pressure switch, and note the
instructions diagram located inside the cover.
Figure 8-1. Pneumatic Subsystem
Pneumatics Calibration
Pneumatic Subsystem
ASP Service Guide rev. D
STERRAD® 100 Sterilizer
8-3
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......