Verify Valve Height for Block 2 systems.
4
4
Note
: With the front panel removed, this procedure can be
performed from the front of the unit.
1. Extend the cam.
2. Insert the gap tool from the front.
3. If adjustment is required, loosen the set screw locking the sealing
ring. Turn the knurled ring until the tool has a snug fit. Tighten the
set screw.
4. Remove the cassette gap tool.
Corrective Action
F
Adjust the injector valve height
F
If cam does not extend properly, check the injector solenoid and
replace if necessary.
F
Replace the injector pump.
Vaporizer Heater Test
Display
ON/OFF VAPORIZER HEATER
W/ START OR NEXT W/ CANCEL
Action
F
Press
START
.
F
A beep sounds to verify that the current sensor is functioning.
F
Check voltage at injector valve connector P-46, the voltage should be
20 -24 VAC (loaded).
Corrective Action
F
Replace wire harness.
F
Replace solid state relay board.
F
Replace current sensor if no beep tone sounds.
F
Verify correct heater impedance.
F
Replace injector valve.
F
Check connection at injector pump.
AutoTest
Injection and Pneumatics Tests
B-18
STERRAD® 100 Sterilizer
ASP Service Guide rev D
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......