
4. Check temperature at rear and side of unit to verify that the chamber
is between 42-50°C.
4
Note:
For STERRAD
100 S
Systems measure the temperature
during the second injection stage.
Door and Chamber Temperatures (Block 2)
1. Begin an empty chamber cycle.
2. Check the voltage at chamber heater connector P115. It should read
208 ±10% VAC. Check the voltage at door heater connectors P95. It
should read 208 ±10% VAC. (These are nominal readings only to
check shorts and opens).
4
4
Note:
Block 2
has 4 J-type thermocouples connectors. T/C 1
and T/C 2 are located at the right rear of the frame near
the chamber. T/C 3 and T/C 4 are located on the lower
right of the door.
4
4
Note: For STERRAD
100 S
Systems measure the temperature
during the second injection stage.
3. Connect an Omega thermocouple tester (J-type) to T/C 1. Verify that
the temperature measured during the diffusion stage is 42-50º C.
Repeat for all thermocouples listed in the note above.
Product Certification
Certification Procedures
13-12
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Содержание STERRAD 100
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......