![ABB ACS380 Series Скачать руководство пользователя страница 535](http://html.mh-extra.com/html/abb/acs380-series/acs380-series_firmware-manual_2560535.webp)
Appendix A - ACS380 in crane applications 535
This flowchart shows the brake system check sequence.
Enable Brake control
(
44.01
bit 0)
Enable Torque proving
(
44.202
=
Selected
)
Start command activated
and motor running
DC magnetization time
(
21.02
) elapsed
Brake system check time
(
44.204
) started
Torque reference =
Torque proving reference
(
44.203
)
Brake system check
time (
44.204
)
elapsed
Motor torque (
01.10
) >
Torque proving
reference (
44.203
)
Motor speed > Brake
slip speed limit
(
44.205
)
Brake slip fault delay
(
44.206
) elapsed
Torque proving ok
Brake slip ok
Torque proving ok
D100
Torque prove
Brake slip ok
D101
Brake slip
Brake open
command
No
Yes
No
Yes
No
Brake system
check time
(
44.204
) elapsed
Brake system
check time
(
44.204
) elapsed
ACS380 FW.book Page 535 Friday, May 4, 2018 4:18 PM
ghv Vertriebs-GmbH
| Am Schammacher Feld 47 | 85567 Grafing | T 49 80 92 81 89 0 | [email protected] |
www.ghv.de