![Rohde & Schwarz R&S NRP Operating Manual Download Page 181](http://html.mh-extra.com/html/rohde-and-schwarz/rands-nrp/rands-nrp_operating-manual_1477868181.webp)
Remote Control - Commands
R&S NRP
1144.1400.12 6.6
E-3
Definition of string components:
<string1>
designation
<string2>
manufacturer
<string3>
serial number of the R&S NRP
<string4>
firmware version
*IST?
- Individual Status Query
Returns the current value of the IST flag. The IST flag is described in section
Æ
"
IST Flag and Parallel
Poll Enable Register (PPE)
" on page
6.77
.
*OPC
- OPeration Complete
Sets the operation complete bit in the Standard Event Status Register as soon as all currently executed
commands have been completed. This bit can be used to trigger a service request. *OPC must be at
the end of a program message.
*OPC?
- OPeration Complete Query
After completion of all currently executed commands, the R&S NRP writes a "1" into the output queue.
Since *OPC? waits until all previous commands are executed, "1" is returned in all cases. *OPC?
basically functions like the *WAI command, but *WAI does not return a response. *OPC? is preferred to
*WAI because with *OPC?, the execution of commands can be queried from a controller program
before new commands are sent. This avoids an overflow of the input queue when too many commands
are sent that cannot be executed.
Unlike
*WAI
,
*OPC?
must be at the end of a program message.
*OPT?
- OPTion Query
Returns a string to the output queue containing information about all options installed.
Option
Response string
1 "NRP-B1:
Test
generator
installed"
2
"NRP-B2: Second channel interface installed"
3 "NRP-B3:
Battery
installed"
4 "NRP-B4:
Ethernet
interface
installed"
5 "NRP-B5:
Four
channel
interface
installed"
6
"NRP-B6: Sensor A/B rear socket"