Installation and wiring
Communication connectors and terminals
FR-F800
2 - 67
2.7
Communication connectors and terminals
2.7.1 PU
connector
Mounting the operation panel or parameter unit on the enclosure surface
Having an operation panel or a parameter unit on the enclosure surface is convenient. With a con-
nection cable, the operation panel or the parameter unit can be mounted to the enclosure surface
and connected to the inverter.
To connect the operation panel or the parameter unit to the inverter, use an option FR-CB2
, or a con-
nector (RJ-45 connector) and cable (communication cable) available on the market.
(To mount the operation panel, the optional connector (FR-ADP) is required.)
Securely insert one end of the connection cable until the stoppers are fixed.
Communication operation
Using the PU connector enables communication operation from a personal computer, etc. When the
PU connector is connected with a personal, FA or other computer by a communication cable, a user
program can run to monitor the inverter or read and write parameters.
Communication can be performed with the Mitsubishi inverter protocol (computer link operation).
For the details, refer to page 5-453.
I003011E
Fig. 2-45:
Connecting a parameter unit or the operation panel using a connection cable
NOTES
Refer to the following table when fabricating the cable on the user side. Keep the total cable
length within 20 m.
Commercially available products (as of February 2015)
U
P
D
W
F
F
T
S
Operation panel connection
connector (FR-ADP) (option)
Operation panel
(FR-DU08)
Parameter unit connection cable
(FR-CB2
)(option)
Parameter unit (FR-PU07)
(option)
Operation panel
(FR-LU08) (option)
Name
Model
Manufacturer
Communication cable
SGLPEV-T (Cat5e/300 m) 24AWG × 4P
Mitsubishi Cable Industries, Ltd.
RJ-45 connector
5-554720-3
Tyco Electronics
Summary of Contents for FR-F820-00046
Page 2: ......
Page 4: ......
Page 114: ...System configuration for Ethernet communication FR F800 E Installation and wiring 2 86 ...
Page 172: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Page 812: ...Inverter to inverter link function FR F800 E Parameters 5 640 ...
Page 900: ...Outline dimension drawings Specifications 8 26 ...
Page 929: ...Appendix EC Declarations of Conformity FR F800 A 29 ...
Page 930: ...EC Declarations of Conformity Appendix A 30 ...
Page 931: ...Appendix EC Declarations of Conformity FR F800 A 31 ...
Page 932: ...EC Declarations of Conformity Appendix A 32 ...
Page 933: ...Appendix EC Declarations of Conformity FR F800 A 33 ...
Page 934: ...EC Declarations of Conformity Appendix A 34 ...
Page 935: ...Appendix EC Declarations of Conformity FR F800 A 35 ...
Page 936: ...EC Declarations of Conformity Appendix A 36 ...
Page 937: ...Appendix EC Declarations of Conformity FR F800 A 37 ...
Page 938: ...EC Declarations of Conformity Appendix A 38 ...
Page 939: ......