![Mitsubishi Electric FR-F820-00046 Instruction Manual Download Page 560](http://html.mh-extra.com/html/mitsubishi-electric/fr-f820-00046/fr-f820-00046_instruction-manual_1811886560.webp)
(A) Application parameters
Parameters
5 - 388
●
When the elapsed time reaches the pre-charge ending time (Pr. 762 "Pre-charge ending time"
≠
"9999")
The pre-charge operation ends when the pre-charge time reaches the Pr. 762 setting or higher,
then the PID control is performed.
●
When the signal is input to end the pre-charge operation
When the X77 signal turns ON, the pre-charge operation ends, and the PID control starts. (If a start
command is given while the X77 signal is ON, the pre-charge operation is not performed, and PID
control starts.)
I002703E
Fig. 5-181:
Pre-charge ending time (Pr. 762 ≠ 9999)
I002701E
Fig. 5-182:
Assignment of signal X77 (Pr. 178 to Pr. 189)
NOTES
When the PID output suspension (SLEEP) function is in use, and the X77 signal is set to valid after
this function is released, set the X77 signal to OFF after checking that the during pre-charge oper-
ation signal (Y49) is OFF.
When the PID output suspension (SLEEP) function is in use, and PID control is to be performed
immediately after this function is released, leave the X77 signal ON until PID control ends.
When the pre-charge operation is valid, the pre-charge operation is performed at the output shut-
off cancellation (MRS signal, etc.). (The pre-charge operation is also performed in the case of
instantaneous power failure when the automatic restart after instantaneous power failure is valid.)
When the control method is changed to PID control from a control with higher priority in fre-
quency command (multi-speed setting, Jog operation, etc.), the motor is accelerated/decelerated
until its speed reaches the automatic switchover frequency (Pr. 127), and the pre-charge is per-
formed.
STF
Y49
Ending time
PID control
Time
0 Hz
Pr. 127
Output frequency [Hz]
X77
STF
Y49
PID control
Time
10 ms or more
Output frequency [Hz]
Pr. 127
0 Hz
Summary of Contents for FR-F820-00046
Page 2: ......
Page 4: ......
Page 114: ...System configuration for Ethernet communication FR F800 E Installation and wiring 2 86 ...
Page 172: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Page 812: ...Inverter to inverter link function FR F800 E Parameters 5 640 ...
Page 900: ...Outline dimension drawings Specifications 8 26 ...
Page 929: ...Appendix EC Declarations of Conformity FR F800 A 29 ...
Page 930: ...EC Declarations of Conformity Appendix A 30 ...
Page 931: ...Appendix EC Declarations of Conformity FR F800 A 31 ...
Page 932: ...EC Declarations of Conformity Appendix A 32 ...
Page 933: ...Appendix EC Declarations of Conformity FR F800 A 33 ...
Page 934: ...EC Declarations of Conformity Appendix A 34 ...
Page 935: ...Appendix EC Declarations of Conformity FR F800 A 35 ...
Page 936: ...EC Declarations of Conformity Appendix A 36 ...
Page 937: ...Appendix EC Declarations of Conformity FR F800 A 37 ...
Page 938: ...EC Declarations of Conformity Appendix A 38 ...
Page 939: ......