Installation of the inverter and enclosure design
Installation and wiring
2 - 18
●
Measures against low temperature
–
Provide a space heater in the enclosure.
–
Do not power OFF the inverter. (Keep the start signal of the inverter OFF.)
●
Sudden temperature changes
–
Select an installation place where temperature does not change suddenly.
–
Avoid installing the inverter near the air outlet of an air conditioner.
–
If temperature changes are caused by opening/closing of a door, install the inverter away from
the door.
Humidity
Operate the inverter within the ambient air humidity of usually 45 to 90% (up to 95% with circuit
board coating). Too high humidity will pose problems of reduced insulation and metal corrosion. On
the other hand, too low humidity may cause a spatial electrical breakdown.
The insulation distance defined in JEM1103 "Control Equipment Insulator" is humidity of 45 to 85%.
●
Measures against high humidity
–
Make the enclosure enclosed, and provide it with a hygroscopic agent.
–
Provide dry air into the enclosure from outside.
–
Provide a space heater in the enclosure.
●
Measures against low humidity
Air with proper humidity can be blown into the enclosure from outside. Also when installing or
inspecting the unit, discharge your body (static electricity) beforehand, and keep your body away
from the parts and patterns.
●
Measures against condensation
Condensation may occur if frequent operation stops change the in-enclosure temperature sud-
denly or if the outside air temperature changes suddenly.
Condensation causes such faults as reduced insulation and corrosion.
–
Take the measures against high humidity.
–
Do not power OFF the inverter. (Keep the start signal of the inverter OFF.)
NOTE
For the amount of heat generated by the inverter unit, refer to the Technical News (MF-Z-118)
contained in the enclosed CD-ROM.
Summary of Contents for FR-F820-00046
Page 2: ......
Page 4: ......
Page 114: ...System configuration for Ethernet communication FR F800 E Installation and wiring 2 86 ...
Page 172: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Page 812: ...Inverter to inverter link function FR F800 E Parameters 5 640 ...
Page 900: ...Outline dimension drawings Specifications 8 26 ...
Page 929: ...Appendix EC Declarations of Conformity FR F800 A 29 ...
Page 930: ...EC Declarations of Conformity Appendix A 30 ...
Page 931: ...Appendix EC Declarations of Conformity FR F800 A 31 ...
Page 932: ...EC Declarations of Conformity Appendix A 32 ...
Page 933: ...Appendix EC Declarations of Conformity FR F800 A 33 ...
Page 934: ...EC Declarations of Conformity Appendix A 34 ...
Page 935: ...Appendix EC Declarations of Conformity FR F800 A 35 ...
Page 936: ...EC Declarations of Conformity Appendix A 36 ...
Page 937: ...Appendix EC Declarations of Conformity FR F800 A 37 ...
Page 938: ...EC Declarations of Conformity Appendix A 38 ...
Page 939: ......